In 2022, the Shanghai Laogang Wet Waste Treatment Plant selected two containerized J420 and four J620 generator sets with a total installed capacity of 15MW. As the largest wet waste treatment center in Shanghai, it will improve the waste treatment efficiency of the entire plant and solve the electricity and heat needs of the entire plant.